Moving Checklist: the 12-Week Plan
The whole move as one plan: 12 weeks scheduled backwards, termination with replacement template, logistics, handover day and address master list.
Checked on 19.08.2026 by Jens Herbst, BoVitaWe keep every document current and check it regularly against the sources.
Who is this document for?
For any move within Switzerland, from a room to a family flat, including special cases like abroad, canton change, school and pets.
What is inside
- 12-week plan scheduled backwards from moving day
- Landlord termination with replacement-tenant template under Art. 264 CO
- Logistics checklist and handover-day list
- Contracts-to-transfer table (electricity, internet, insurance)
- Address-update master list and special cases (abroad, canton change, school, pets)
How to fill it in
- 1Enter your moving day first; every week counts backwards from it.
- 2Tick the address master list in one sitting; scattered updates are the most common gap.
- 3Bring the handover-day list printed to the handover.
Frequently asked questions
For any Swiss move, whether room, flat or family; the special-case blocks cover abroad, canton change, school and pets.
Because notice periods, replacement-tenant search and tradespeople realistically need that lead time; the plan runs backwards so nothing lands in the final week.
Yes: deregister with the old municipality and register with the new one within 14 days; the checklist includes both plus the address master list for everyone else.
Because a checklist should travel: download it directly, share it with your household, and if it helps, a Google review makes our day.
Looking for a room, not just documents?
BoVita rents furnished shared rooms with all-in rent in Aarau, Wohlen, St. Gallen and Brugg. Reply within 48 hours on working days.
See locations and available roomsRelated documents
Lease Termination Toolkit
Terminate ordinarily or extraordinarily with 10 building blocks: notice letter, family-home variant, replacement-tenant package and deposit release.
Handover Protocol (Word Template)
Hand over room by room: per-room table, meter readings, defect list, key handover and lifespan table against unjustified deductions.
Handover Protocol as PDF Form
The same handover logic as a PDF to print directly for the appointment when Word is not at hand.